The scope for this is Road Safety Audit Report (Construction Stage - Stage 4). The scheme is located to the southwestern end of the ‘The Line’ project.
The scheme is a 2-way single carriageway with a posted speed of 80kph.
The scheme is approximately 10km long.
There is 1 Right-in/Right-out junction providing access to the coastguard station at the southern end of the scheme.
The scheme is a dead-end at the southern end with a turning area provided. Traffic calming is provided on approach to the turning area.
There are 2 roundabouts provided towards the northern end of the scheme. These roundabouts connect to adjacent roads. The scheme ties into Highway 392 to the north.
The scheme ties into the service road for an adjacent residential camp. The service road and adjacent camp access is not in the scope of this Road Safety Audit.