• info@duffy.qa
  • +974 4006 1970
  • About Us
    • About Us
    • Latest News
    • Company Brochure
  • Services
    • Traffic Impact Studies
    • Road Safety Audits
    • Traffic Diversion Plans
    • Temporary Traffic Management
    • Road Safety Assessments
    • Traffic Signal Design
    • Traffic Modelling and Analysis
    • Road Design
  • Projects
    • Featured
    • Traffic
    • RSA
    • TDP
  • Clients
  • Partners
  • Careers
  • Contact Us

Road Safety Audit for Roads and Infrastructure in Southwest of Al Wukair

  • Home
  • Projects
  • Road Safety Audit for Roads and Infrastructure in Southwest of Al Wukair
DCE was appointed to carry out the Construction Stage (Stage 3) RSA for Roads and Infrastructure in Southwest of Al Wukair. The length of the Roads in the project is approximately 20km including road corridors of 20m, 40m and Sikka Alleyways. The roads are classified as per QHDM 2015.” There are 9 roundabouts provided within the scheme. There are 2 types of roads in the scheme: Two-way single carriageways (local roads) with lane widths of 3.3m and posted speeds of 50kph. These roads have a 20m right of way.1-lane dual carriageways (with flush median) with lane widths of 3.3m and posted speeds of 50kph (collector roads). These roads have a 40m right of way. The land use is largely residential with 3 commercial plots, 3 mosques, 4 open spaces and 14 government plots.

We are ready to build

Contact us

Latest News

Dec 2025
Happy Qatar National Day!

Happy Qatar National Day! From all of us at Duffy Consultant Enterprise, we celebrate the unity and progress that define…

Nov 2025
Road Safety Audits – The Mysteries Unravelled

On 6th November 2025, our team joined another great Chartered Institution of Highways & Transportation (CIHT)/SoRSA webinar: “Road Safety Audits…

Sep 2025
Workshop for the Qatar Bicycle Master Plan (QBMP)

🚴‍♀️ Duffy Consultant Enterprise was pleased to have staff attend the 3rd Stakeholder Workshop for the Qatar Bicycle Master Plan…

Useful links

  • About Us
  • Careers
  • Projects
  • News

Social Links

Address

No. 15, 3rd Floor
Al Reem Tower, West Bay
P.O. Box 21301
Doha, Qatar

Phone

+974 40061970

Email

tom@dce.ie

© 2026 Duffy Consultant Enterprise. All Rights Reserved.
  • Contact Us