• info@duffy.qa
  • +974 4006 1970
  • About Us
    • About Us
    • Latest News
    • Company Brochure
  • Services
    • Traffic Impact Studies
    • Road Safety Audits
    • Traffic Diversion Plans
    • Temporary Traffic Management
    • Road Safety Assessments
    • Traffic Signal Design
    • Traffic Modelling and Analysis
    • Road Design
  • Projects
    • Featured
    • Traffic
    • RSA
    • TDP
  • Clients
  • Partners
  • Careers
  • Contact Us

Traffic Impact Study for Aspire School, Al Waab

  • Home
  • Projects
  • Traffic Impact Study for Aspire School, Al Waab
DCE was appointed to conduct a traffic impact study for Aspire School. The proposed development is a school located in Al Waab, Doha, Qatar . The land use categories ‘Class 315: Private School’ and ‘Class 321: Institute of Higher Education’ (from the Dubai Trip Generation and Parking Rates Manual 2013), were utilized as the most appropriate categories for the development. The primary purpose of the TIS is to identify the impacts of the proposed development on the surrounding transportation network, and to determine appropriate measures to mitigate these impacts, if required.

We are ready to build

Contact us

Latest News

May 2026
Eid Mubarak!

🌙✨ Eid Mubarak from Duffy Consultant Enterprise ✨🌙 On this joyous occasion, we share our sincere wishes for harmony, success,…

Mar 2026
Our Team in Qatar is Safe and Operating as Normal

Amid recent developments in the region, we want to reassure our clients that our team in Qatar is safe and…

Feb 2026
🌙 Ramadan Kareem

🌙 Ramadan Kareem from Duffy Consultant Enterprise Wishing peace, prosperity, and togetherness to all during this special time.

Useful links

  • About Us
  • Careers
  • Projects
  • News

Social Links

Address

No. 15, 3rd Floor
Al Reem Tower, West Bay
P.O. Box 21301
Doha, Qatar

Phone

+974 40061970

Email

tom@dce.ie

© 2026 Duffy Consultant Enterprise. All Rights Reserved.
  • Contact Us