DCE was appointed to carry out the Construction Stage (Stage 3) RSA for Al Muharraq Asset 11 Phase 2A, Kingdom of Bahrain.
There are two separate areas located in proximity to each other included as part of this scheme.
The first area is detailed as followed:
This area includes the north arm of the signalised intersection (Junction 05), as well as 3 dual carriageways and 2 access roads located on Diyar Al-Muharraq Island, in the Kingdom of Bahrain.
There are existing residential townhouses in the southern side of this area. The northern side is currently undeveloped however, apartments and retail are to be constructed in the future.
The ROWs vary from 15m to 45m for the roads in this area and the lane widths are 3.75m.
The adjacent plots are all residential. The majority of the plots are currently vacant.
There are 3 roundabouts and 1 signalised intersection in this area.
The posted speed limit is 30 kph (design speed is 30kph) on the 2-way single carriageway access roads and the posted speeds are 50-70kph on the dual carriageway collector/distributor roads.
The second area is detailed as followed:
This area is a single lane U-turn on Road MC10.
The U-turn is from the eastbound carriageway to the westbound carriageway.
A diverge lane is provided on approach to the U-turn
A freeflow merge lane is provided on the exit from the U-turn