DCE were appointed by J&P to undertake multiple detailed design (stage 3) and pre-opening audits (Stage 4) on Contract 1 as part of the temporary traffic management for the Orbital Expressway programme.
This project is a 45 km new dual carriageway that includes four grade-separated interchanges. It is located to the South of Doha City and will connect Al Wakra – Mesaieed Highway and the New Doha Port to the East- West Corridor in the north, to Al Wakra Bypass in the east, and to the Orbital Highway in the west.
The detailed design (stage 3) and pre-opening audits (Stage 4) were carried out as part of the Orbital Expressway Beneficial Use opening.