DCE were appointed by Daewoo to undertake numerous preliminary design (Stage 2), detailed design (Stage 3) and pre-opening audits (Stage 4) on Contract 4 as part of the Orbital Expressway programme.
This project involves the construction of approximately 40km of freeway from Dukhan Highway travelling north and then north eastwards to connect to the future Al Khor bypass Project 22.
As part of the Orbital Expressway Beneficial Use opening detailed design (Stage 3) and pre-opening (Stage 4) audits were carried out. As part of the Orbital Expressway permanent works preliminary design (Stage 2), detailed design (Stage 3) audits were carried out.