DCE were appointed by CWG to undertake combined preliminary/detailed design (stage2/stage 3) audits on Package 2 of Line 3 as part of the Riyadh Metro Project in The Kingdom of Saudi Arabia.
The audit comprised an examination of the drawings and other information relating to the scheme supplied by the design office. The Audit was undertaken in accordance with the international best practice and reference to the Qatar Road Safety Audit Guidelines.