DCE was appointed to carry out the Construction Stage (Stage 4) RSA for Roads Improvement Works in Southern Qatar Area.
The scope for this RSA Report covers Road 1 and Road 2.
The scheme consists of two 2-lane dual carriageways. Road 1 is located to the north of Logistics Village (with accesses connecting to GWC warehouses). Road 2 is located to the south of Logistics Village (connecting to local access roads). Both Road 1 and Road 2 tie-in to roundabouts at either end of the scheme.
The posted speed is 80kph for both roads.