DCE was appointed to carry out the Construction Stage (Stage 4) RSA for South of Greater Doha Zones 90 to 95 Phase 7.
The scheme is a 2-lane dual carriageway. There are 2 roundabouts and one RIRO junction. The scheme provides access to the GWC warehouses and ties in to an existing roundabout in the south.
The posted speed is 60kph for the scheme and the lane widths are 3.65m.