DCE were hired to undertake preliminary design and detailed design RSAs for Villamar Highway and Harbour Row Access Roads in Bahrain.
Villamar and Harbour ROW Developments consist of residential buildings, commercial buildings and hotels. The project is in an existing development with existing infrastructure.
The project is located off the existing Bahrain Bay Road. This is a three-lane dual carriageway, which requires a temporary access solution for the initial opening phase of Tower B, and a permanent solution to facilitate the projected traffic flows from the full three tower development.