DCE were appointed by West Bay Petrol Station to conduct a Swept Path Analysis (SPA) for a substation and multi-storey car park. A redevelopment of the internal layout, as well as its connection to the external road network was proposed and a swept path analysis was required to assess the viability of the proposed circulatory layout for design vehicles as well as emergency vehicles.