DCE designed the Traffic Diversion Plan for Porr/Midmac JV, to facilitate the installation of a cable stayed bridge as part of the Gewan Island Project. The 250-metre long bridge, which rests on two pylons 43 metres above The Pearl-Qatar’s Boulevard, will connect the Lusail Expressway and The Pearl-Qatar’s Boulevard to Gewan Island. The Traffic Diversion consisted for 2 phases of contraflow traffic while maintaining all movements.