![](https://www.duffy.qa/wp-content/uploads/2021/04/30452.png)
DCE prepared a Temporary Traffic Diversion Plan design drawing, for QDC. The TDP involved diverting traffic from the existing service road onto the hard shoulder on the mainline over a distance of 150m. This gave the contractor a safe space on the service road to install a large crane need to construct the new Data Center.